Epstein is providing design-build services for an EV battery gigafactory, overseeing the multi-phased adaptive re-use to convert an existing 1.5 million-square foot Kmart DC into a state-of-the-art advanced manufacturing center for Battery Energy Storage Systems (ESS) and Electric Vehicle (EV) batteries.
Phase I (ESS and Pack) included the comprehensive 620,000-square-foot buildout of the existing building and provided space for new 45,700 sf administration offices, welfare, and production lines for ESS and EV battery pack. The project required significant modification to existing infrastructure to accommodate specialized equipment and advanced production processes. With 5 production lines complete in September of 2025, the plant is currently assembling lithium-iron phosphate (LFP) battery packs for energy storage systems and electric vehicle (EV) applications, utilizing cells sourced from the clients oversees facilities. Phase I was completed in a stepped approach with 2 lines operational in September 2024, and 3 additional lines were operational in September of 2025.
In Phase II Gotion adjusted their design in response to changes in the US battery market and customer demands. Phase II (Cell Production) encompasses the development of the first two lines for end-to-end lithium-iron phosphate (LFP) battery cell manufacturing. For this phase, we are converting an additional 642,000 square-feet into areas for Electrode Manufacturing (mixing, coating, drying, calendaring, slitting, drying), Cell Assembly (notching/tab welding, winding/stacking, insertion, tab welding, electrolyte injection, final sealing), and Cell Finishing & Testing (formation, aging, degassing & re-sealing, grading). This expansion involves significant renovations to site and existing building, including the construction of 254,000 square feet of clean rooms, the addition of new utilities for nitrogen, compressed air, helium, pure water, NMP, electrolytes, and several other materials. A completely new electrical infrastructure is being provided to increase the facility from 10MW to 148MW.
Phase III represents the final phase of the project and includes converting the remaining 318,000 square-feet into 2 additional cell manufacturing lines for end-to-end lithium-iron phosphate (LFP) battery cell manufacturing. This phase will also be broken down into multiple phases as Gotion seeks to maintain flexibility in their approach to meet US market and customer demands. Design of Phase 3.1 began in March of this year with an aggressive schedule to start construction in three months.
At full-scale the facility is slated to produce 40 GWh of lithium-ion battery cells and 10 GWh of battery packs, significantly boosting the US EV battery supply.