2009 - 2014 / Knox County, Illinois

Illinois Department of Transportation, District 4, I-74 Bridges Over Henderson Creek

Client

Illinois Department of Transportation, District 4 2009 - 2014 / Knox County, Illinois

Services

Civil Engineering
Structural Engineering

Markets

Government
Transportation

Share

Overview

Epstein provided Phase II civil and structural engineering services for the removal and replacement of dual highway bridges on I-74 over Henderson Creek.

Process

IDOT-I-74-Bridges-Over-Henderson-Creek-KEpstein's services included preparation of TSL, and construction documents, structural design, the design of approach roadway, drainage and traffic management. The existing two-lane, three-span east and westbound structures had span lengths of 121 feet and 115 feet, both on curve alignments, and we're replaced by single span bridges utilizing pre-stressed concrete bulb–T beams on concrete deck and supported by integral abutments. The new bridge lengths are 108 feet eastbound and 102 feet westbound.IDOT-I-74-Bridges-Over-Henderson-Creek-K

Team

Greg Osborne, PE
Vice President, Director of Civil Engineering