Overview

Epstein provided DesignBuild services for a new manufacturing and regional office facility for Cameron International. These services included all architectural design and engineering, including civil, structural, mechanical, and electrical.

Epstein also performed all construction contracting and management of the construction phase of the project including procurement, scheduling, safety and quality management, and the management and coordination of over a dozen separate trade and specialty subcontractors.

The new facility is used for the production of extremely high pressure natural gas and petroleum well delivery and pipeline systems. The production operations include automated machining of these high precision valve and well head components, heat treatment, precision automated micro-welding, quality checking and assurance areas, final product cleaning and finishing.

The office facilities include both administrative and management support for the production facility as well as other regional business activities for Cameron.

The new facility is situated within the Ploiești Industrial Park on a 550 hectare parcel. The site is fully fenced and designed with a single entry with Guard House and barrier gates. The building is roughly centered on the site with parking and truck access areas on both the north and south ends of the facility and a loop roadway on the east and west sides of the building providing vehicle and truck access to all sides of the building.