Filtru

All
Blog

/ 4.20.18

Mennica Legacy Tower - April 2018 Construction Progress Update

Construction continues on the two-building Class A Office Mennica Legacy Tower, which will be comprised of a 35-story east tower and a 10-story west building located in the Central Business District of Warsaw. For this project, Epstein is serving as ...

/ 4.4.18

Fort Competition Teaches Kids About Architecture, Design

Breakthrough’s youth were back in action with Refortify volunteers last week, learning design and architecture skills while building their dream forts. For five weeks, kids between the ages of 7 and 11 were encouraged to brainstorm ideas, research an...

/ 3.22.18

Conrad Chicago Wins GCFD Hotel Redevelopment of the Year Award

Last week, Conrad Chicago, a project that Epstein served as the architect of record as well as civil, MEP/FP, and structural engineer, won the Hotel Redevelopment of the Year Award at the 30th Annual Greater Chicago Food Depository (GCFD) Chicago Com...

/ 3.14.18

Randy Buescher Joins Glessner House Museum Board

This past Monday, March 12th, L. Randall (Randy) Buescher, AIA, our senior vice president and director of architecture and interior design, was officially confirmed as a Board Member for the Glessner House Museum, a National Historic Landmark which w...

/ 3.13.18

Illinois Tollway M-7 Maintenance Facility Nearing Completion

The Illinois Tollway’s M-7 Vehicle Maintenance Facility project in Rockford, Illinois, located at East State Street and I-90, is the second site to be addressed in a system-wide program being planned, designed and engineered by Epstein. The first fac...

1   2   3   4   5   6   >